Select Board – June 22 – DRAFT MINUTES

Town of Woodbury Select Board Meeting Minutes
June 22, 2026
Attendees
Select Board Members: Diana Peduzzi, Chris Casey, John Gordon
Town Officials: Lilly Baron (Town Treasurer); Graham Christie (Town Clerk)
Town Employees: Peter Dailey (Road Commissioner ); Michael Gray (WSB assistant): Robin Durkee (Town Clerk
Asst.)
Members of the Public: Carol Ray
Media: Jerome Lipani – HCTV
Call to Order Chris called the meeting to order at 6:00 P.M.
Adjustments to Agenda The emergency generator will be discussed in the Update se ction
Approval of Previous Meeting Minutes
The minutes from the June 9, 2026, Select Board meeting were approved.
Public Comment Robin asked, when will Cabot Road be graded? Peter replied, tomorrow.
Road Commissioner’s Report with Peter Dailey
Garage Roof Update - Chris reported no updates on the garage roof. He spoke with Chris Temple (DeWolfe
Engineering) and was told by Chris that before agreeing to advise the town, he might need to run it by the new
owner of the company.
550 Update – Peter has not received any responses, after many inquiries, from McGee Ford about costs for a new
550 or smaller replacement. He contacted Lamoille Valley Ford and was given a quote of $64,000 for a new 350
truck with a plow. Peter will get the old 550 from McGee and deliver it to Lamoille Valley so they can give a trade-in
estimate. The Town may need to get a new sander that would work with a new 350.
Wheeler Hill Road - Work is almost complete on the south side of Wheeler Hill Road. Check dams and
hydroseeding of the ditching will complete the project. The section of road has also been resurfaced with crushed
ledge, which should hold up better than gravel.
Log Town Road – The recent heavy downpours have trenched Log Town Road and restricted travel to one lane. The
road crew will be repairing the damage this week.
Roadside Mower - The roadside mower is down with worn out bearings. Finding replacements has been hard as
the company that built the mower no longer exists. Peter has found one replacement but it is very expensive – $700
for one bearing. The mower, which attaches to the bucket loader, has always been an inconvenience , as it limits
the use of the bucket loader and adds wear and tear on the loader. Hiring out the roadside mowing was discussed.
Access Permit – Peter has an access permit for a property owner along County Road who wants to create a log
landing near the road and an access point to the landing from the road. The permit was signed.
Grant Updates: with Michael Gray
The town has received the officially signed grant agreements for 4 VTrans grants. These include the engineering
and design work for the future culvert replacements on Church Street and B ailey Bridge Road; the paving grant for
Foster Hill Road and the Better Roads grant for the village section of Valley Lake Road that will be done in
conjunction with this summer’s culvert replacement at the bottom of Valley Lake Road. The hydraulic studies for
the Church Street and B ailey Bridge Road culv ert work have been received. Finally, the BRIC grant for a study of
the Buck Lake Brook Watershed to mitigate flooding in the village has passed through the project review process

and is now being prepared for submission to FEMA for review. Michael is working with Keith Cubbon of CVRPC on
this project.
Fire and EMS Protection Contract with WVFD
The FY 27 contract with the WVFD for fire and EMS protection was signed by the WSB.
Town Clerk’s Report with Graham Christie
Graham reported there are 25 dogs belonging to 17 residents that have not yet been licensed. Graham requests
the WSB advise him on the best way to get word to these owners. It is suggested that a notice be posted on FPF ,
after which another mailing or phone call might be next..
Town Treasurer’s Report with Lilly Baron
FY27 Wage Increases – Lilly presented a warrant for WSB signature authorizing wage increases for
FY27. Some wage adjustments were implemented during FY26. Lilly requests the WSB review and confirm that all
current wages will receive the 3% increase (as of July 1) as approved during our budget meetings.
FY27 Sand Contract - The proposed sand contract for FY27 was discussed. The contract is identical to
the FY26 version, apart from updated dates. If the WSB and the Road Commissioner are
satisfied with the contract language, it will be released for bid. A one year contract versus a three year contract for
sand was discussed. The WSB decided to proceed with a three year contract. Because the contract amount is
expected to exceed $8,000, it will be advertised in the required posting locations and published in the designated
newspaper in accordance with procurement requirements. Lilly will send the RFP to the Times Argus, the
Hardwick Gazette (News and Citizen?) and a couple of suppliers who have bid in the past.
Accounts Payable Warrants: With the approaching end of the fiscal year, Lilly requests the WSB sign
two additional Accounts Payable warrants prior to the next regular meeting. These warrants will be prepared by
July 1. Lilly requests at least two WSB members to come to the office on July 1 to review and sign the warrants.
Updates on Buyouts with John Gordon
John has prepared one RFP for the two buyout projects in the village. The WSB reviews and discusses different
parts of the project listed in the RFP. Robin asks about the artesian well that serves the town hall and the post
office. John will make discussed changes to the RFP and send the RFP to Graham to post.
FEMA Status Update Skip sent a report to the WSB stating that there is no change in the status.
Personnel Policy with Lilly Baron
Lilly has provided a summary of the changes to the Personnel Policy, along with the
most recent draft of the
revised policy. If the WSB is satisfied with this version, we can move forward
with formally adopting the policy.
Below is a list of the major changes made:

A. Holiday Time Section 20: The updated policy now states that there will be no premium stacking for
holiday pay and overtime.
B. Vacation Time Section 21: Vacation time is now awarded at 6 months, after the probation period, and
prorated for the remainder of the year.
C. Vacation Time Section 21: The policy regarding annual payout for unused vacation time has been
removed. It has been replaced by an increase in allowable accrual of vacation time per year. Employees
will be paid out at time of separation up to 160 hours of vacation time.
D. Leave of Absence Without Pay Section 26: The new version of the draft allows employees who take
an unpaid leave of absence the ability to stay on our benefits for up to two weeks. Beyond that, the
employee has the option to continue on the town's benefit plan but must pay the monthly premium.
The WSB discusses these changes with Lilly suggesting one change that Lilly will incorporate. The WSB will place
the personnel policy for final approval on the July 13
th
agenda

Updates and Other Business
Emergency Generator – John talked to Paul Cerutti about the generator and was told that the WVFD do es
check the fluids monthly and the generator is programmed to turn on and run once a week. John explained that it
does take a period of time for the generator to kick in with a power outage and that the short glitch outage of a few
weeks ago was probably not long enough to trigger the generator.

Swenson/Polycor Quarry -
Swenson has requested that the Act 250 hearing be postponed to a later date , to
allow continued negotiations. The District Commission approved the request – allowing up to 60 days. Carol Ray
discussed the quarry expansion and her concerns that it has been difficult to follow the process. She requests
access to related documents. Diana explained that all documents are publicly available and how to access them.
The Zoning Board of Adjustment issued their final decision last week. Copies of the decision have (today) been
mailed to all who attended a hearing and requested “interested person” status. Copies of the Pre-Hearing
Testimony and the ZBA decision will be made available at the Town Office.
Bills and Payroll: Bills and payroll orders were signed at the end of the meeting.

Adjournment
The meeting was adjourned at 7 :36 P.M.
Signatures and Approval
Chris Casey ______________________ Diana Peduzzi _________________________
John Gordon ______________________ Date Approved __________

Gu
ide to Acronyms
ACO - Animal Control Officer; ANR – Agency of Natural Resources; AOT – Agency of Transportation; AP – Accounts Payable;
BR- Better Roads; BRIC – Building Resilient Infrastructure and Communities; CDT – Collector of Delinquent Taxes; CIP –
Capital Improvement Plan; CR – Cash Receipts; CRC –Consolidated Resource Center; CVRPC – Central Vermont Regional
Planning Commission; DHC – Department of Health; EC – Ethics Commission; EMD – Emergency Management Director; EMS
– Emergency Medical Service; EOA – Elected Officials Agreement; ERAF – Emergency Relief Assistance Funds; ET – Electronic
Transfer; EWPP – Emergency Watershed Protection Program; FIRM – Federal Insurance Rate Map; FPF – Front Porch Forum;
FY – Fiscal Year; GF – General Fund; GIA – Grants in Aid; HED – Hardwick Electric Department; HERF – Highway Equipment
Replacement Fund; HF – Highway Fund; HMP – Hazard Mitigation Plan; HPD – Hardwick Police Department; H&H –
Hydrological & Hydraulic; LE MP – Local Emergency Management Plan; LHMP – Local Hazard Mitigation Plan; MMA – Money
Market Account; MRGP – Municipal Roads General Permit; MOU – Memorandum of Understanding; MTSC – Mountain Tamers
Snowmobile Club; MVUESD – Mountain View Union Elementary School District; NEMRC – New England Municipal Resource
Center; NEWT – Northeast Wilderness Trust; NRCS – Natural Resources Conservation Service; OSSU – Orleans Southwest
Supervisory Union; PDM – Program Delivery Manager; POC –Point of Contact; PR – Payroll; PTO – Paid Time Off; RBT – RB
Technologies; RC – Road Commissioner; REI – Road Erosion Inventory; RFP – Request for Proposal; ROW – Right of Way; SS –
Seacoast Securities; TAC – Transportation Advisory Committee; TAN – Tax Anticipation Note; TC – Town Clerk; TH – Town
Highway; THO – Town Health Officer; TM – Town Moderator; TTr – Town Treasurer; USDA – United States Department of
Agriculture; VEM – Vermont Emergency Management; VTRANS – Vermont Agency of Transportation; VAST – Vermont
Association of Snow Travelers; WC – Workman’s Compensation; WCC – Woodbury Conservation Commission; WCL –
Woodbury Community Library; W/CFS – Woodbury/Calais Food Shelf; WCSD – Washington County Sheriff’s Department;
WHRT – Woodbury-Hardwick Rail Trail; WRSC – Worcester Rangers Snowmobile Club; WSB – Woodbury Select Board; WPC –
Woodbury Planning Commission; WNRCD – Winooski Natural Resources Conservation District; WVFD – Woodbury Volunteer
Fire Department; ZA – Zoning Administrator; ZBA – Zoning Board of Adjustment

RFP for Winter Sand

TOWN OF WOODBURY
1672 VT RT 14
P.O. BOX 10
WOODBURY, VERMONT 05681
E-mail: clerk@woodburyvt.org�
Phone: 802-456-7051
Web Site woodburyvt.org
Town of Woodbury Request for Bid
�7�K�U�H�H�Year Contract for Winter Sand
The Town of Woodbury is soliciting bids for 3,000 cubic yards of Winter Sand ‰Œ�ÇŒ�(}Œ�
îìîò�r�îìîõ�Á]všŒ�}vX
The sand shall contain 3/8”to 1/2” stone minus screened sand and meet or exceed State
and American Association of State Highway and Transportation Officials (AASHTO)
specifications. (Please see the attached specifications sheet on page 3.) The Town may
request a sand sample to facilitate the bid award process.
The bid should specify two prices: a price if delivered by the vendor to the Town Highway
Garage at 524 Dog Pond Road, Woodbury and a price if picked up at the pit. Please include
the applicable discount percentage if a total annual invoice is prepaid.
Additional information may be obtained by contacting our Road Commissioner, Peter Dailey
at garage@woodburyvt.org or by calling 802.456.8883. Bid forms and bidding instructions
are available by contacting the Town Office by phone, 802.456.7051, or by emailing
clerk@woodburyvt.org or on the town web site woodburyvt.org at
Records/Requests for Proposals.

Bidders must have proper liability insurance in the minimum amount of $1,000,000.
Certificates of Insurance with the Town listed as certificate holder should be forwarded with
the bid.
Bids shall be in a sealed envelope, clearly marked “Bid for Winter Sand” and delivered to the
Town Office by noon on July 13, 2026. Bids will be opened at the Select Board meeting of July
13, 2026. The Town reserves the right to reject any or all bids, and to grant the bid that is
deemed to be in the best interest of the Town.
All bids must in submitted either in person or by mail as specified in the header. No faxed or
emailed bids can be accepted.
INSURANCE:
Worker’s Compensation: The successful bidder will carry Worker’s
Compensation insurance in accordance with the Laws of the State of Vermont.
General Liability: The successful bidder will carry General Liability Insurance
including but not limited to:
Premises
Products and Completed Operations
Personal Liability
Contractual Liability
Personal Injury Liability
The policy shall be on an occurrence form and limits shall not be less
than:
$1,000,000 Per Occurrence
$1,000,000 General Aggregate
$1,000,000 Products/Completed Operations Aggregate
$ 50,000 Fire/ Legal/Liability
Automotive Liability: The Party shall carry automotive liability insurance�covering
all motorized vehicles, including hired and non-owned coverage, used in connection with
the project. Limits of coverage shall not be less than: $1,000,000 combined single limit.
/s/ Chris Casey, Town of Woodbury Select Board Chair
(Duly Authorized Representative of the Town of Woodbury)

Specifications for Winter Sand
Winter Sand shall be clean, hard, screened sand, uniformly graded from coarse to fine, and
shall be reasonably free from silt, loam, clay, or organic matter. The sand shall be obtained
from approved sources and shall meet or exceed the following requirements, including passing
a Ph. test.
Sieve Designation % by Weight Passing Square Mesh Sieves
Up 1/2” 100
No. 4 90-100
No. 100 2-10
1. The material will be sampled by the Highway Road Crew and tested. 2. Product Availability:
Delivery Option: August-December
Picked up at the Pit: August-December
The Town reserves the right to contract with a third-party hauler to haul the product to
the Town site.
3. The Town reserves the right to test the product at any time and take appropriate
action if the product is deemed deficient including cancelation of the contract or
refusal of any delivery.
4. The successful bidder shall indemnify and hold harmless the Town, its officials,
agents, and employees from any loss or liability which may result from claims of
injury to persons or property from any cause arising out of or during the delivery of
product to the Town.
5. The Town reserves the right to purchase any product from any vendor other than the
accepted bidder.

Town of Woodbury
Town Office Building
1672 Vermont Route 14, P.O. Box 10
Woodbury Vermont 05681
Winter Sand Bid 3,000 Cubic Yards
Bids are to be submitted in a sealed envelope, clearly marked “Bid for Winter Sand” and
delivered in person or by U.S. Mail. No faxes or emails will be accepted.
Bids are due no later than 12 P.M. - Noon on July 13, 2026
Name of Bidder:
Bidder’s Address:
Bidder’s Email Address:
Bidder’s Phone Number:
Bid Amount Delivered: per Cubic Yard Delivered
Bid Amount at the Pit: per Cubic Yard at the Pit
Applicable Discount Percentage: %
Signature of Bidder:
Town of Woodbury
p
p

Town Office Building
1672 Vermont Route 14, P.O. Box 10
Woodbury Vermont 05681
Winter Sand Bid 3,000 Cubic Yards
The Town of Woodbury is soliciting bids for 3,000 total cubic yards of sand per year for the
2026-202� winter season�V� The bid document is available at the Woodbury Town Office, 1672
VT Route 14, Woodbury, VT from 9:00am-1:00pm and on the town’s website, woodburyvt.org
under “Records/Request for Proposals.”
Bids are to be submitted in a sealed envelope, clearly marked “Bid for Winter Sand” and
delivered in person or by U.S. Mail. No faxes or emails will be accepted.
For any questions, please contact Graham Christie at clerk@woodburyvt.org or call
802-456- 7051.
Bids are due no later than 12 P.M. - Noon on July 13, 2026
Bids will be opened at the Woodbury Library Community Room on 7/13/2026 during
the Woodbury Town Select Board Meeting at 6:00pm

Select Board – June 9 – MINUTES

Town of Woodbury Select Board Meeting
Minutes
June 9, 2026
Attendees
Select Board Members: Diana Peduzzi, Chris Casey, John Gordon
Town Officials: Lilly Baron (Town Treasurer)
Town Employees: Peter Dailey (Road Commissioner); Michael Gray (WSB assistant)
Members of the Public: Carol Ray
Media: Jerome Lipani -HCTV
Call to Order Chris called the meeting to order at 6:04 P.M.
Adjustments to Agenda add David Barber's request to declassify TH 21 and bridge repair
Approval of Previous Meeting Minutes
The minutes from the May 27, 2026, Select Board meeting were approved:
Public Comment Carol Ray requests a discussion and more transparency about the Swenson
Quarry expansion and permitting processes. Carol states she is not concerned about the reimbursement rate
the WSB is negotiating, her greater concern is about the quality of life in Woodbury. The WSB discusses this
with Carol, pointing out their role within the Act 250 process and the ZBA's role, stressing that the ZBA is the
entity Carol should bring her concerns to.
Road Commissioner's Report with Peter Dailey
Peter has not been able to meet with David Barber to look at the bridge on TH21. Peter has met with a
resident on Cabot Road who is requesting a permit for a curb cut and wants to bore under the road to run a
power line. The landowner was advised to pick up three permit applications at the Town Office -access (curb
cut), Work within the Road ROW and a zoning application. On Friday Peter met with VAST on site along West.
Woodbury Road to review their proposed work to improve the road for snowmobile travel. They have
requested the road be closed for the two weeks the work is being done. The work is anticipated to occur in the
fall. The WSB approves closing the road as long as it does not affect any residents. The permit for the road
work was signed. Peter is still waiting for McGee Ford to get back to him with a trade-in offer for the 550 and
pricing for a smaller truck. Peter has met with the NEK/CVFiber reps and the permit to allow placing
underground fiber in the ROW of Scribner Road, was signed with the condition that the conduit for the cable
will be underneath the culvert. The culvert replacement and fiber wiil have to be done simultaneously.
Discussion then turns to the garage ceiling/roof project.
Garage Roof Repair Chris met with Steve Connor of Connor Contracting (who lives in Woodbury) to review
the roof and ceiling repair. They established there was no water leakage with the chimney but there was water
damage to the roof sheathing, most likely from condensation. Steve felt the· $40k PACIF had proposed as
compensation for the repair work would not cover the work that would be needed. There will be another on site
meeting with PACIF to take another look at the project. Chris feels it may be too late to hire a contractor to do
the work this year. He feels the town may have to come up with a short-term fix for the coming winter while
also working out a long-term plan/vision for a new garage. The board realizes that the garage is not in good
shape and is deficient in many ways. He will be meeting with the Calais SB to see if there might be the
possibility of sharing garage space there. Options for a new garage and ways to get more space for use at or
near the present garage, were discussed. Another local resident, Chris Temple of DeWolfe Engineering, might
be helpful.

Grant Updates: with Michael Gray
Michael has received the VTrans grant agreements for the culvert engineering/design work of Church Street
and Bailey Bridge Road. He is also anticipating grant agreement forms for the paving of Foster Hill Road and
the Better Roads Valley Lake Road project. The WSB authorized him to sign the grant agreements on behalf
of the town.
Town Treasurer's Report with Lilly Baron
The General Fund is currently operating at a budget deficit of -$73,235. The town is just slightly under
$100,000 off from our budgeted revenue. This translates closely to the $92,498 still sitting in our
delinquencies for the current year. The Highway Fund has a budget surplus of $108,378, and remains in
a strong position. Our Highway fund has exceeded our budgeted revenues and is currently underspent
for this period. Overall, the FY26 budget remains in a net position of $35,143 year-to-date when considering
both funds. Total cash on hand is $905,310. As a reminder, $527,301 of our current cash balance is restricted
FEMA funding that will be repaid once we receive formal notice to return the funds.
Given the substantial FEMA funding received last year, a direct comparison of total cash balances is not
an apples-to-apples comparison. Excluding restricted FEMA funds, our current cash position is
$378,010, compared to $562,854 at Period 11 (the month before the end of the fiscal year) last year, a
decrease of $184,844 year over year. One driving factor of this decrease is purchase of the new truck and
deficit in the HERF fund. In the General Fund, we should still be receiving a large refund from the School
District for an overpayment on the State Education Tax payment which will increase our General Fund before
the end of the fiscal year.
The end of the fiscal year is approaching. Lilly will provide a report on the month of June at the first meeting in
July, followed by a full fiscal year-end review at the second meeting. Over the next few weeks, we will gain a
clearer picture of our cash flow needs and whether it would be prudent for Woodbury to utilize its line of credit
to bridge the gap between the end of the fiscal year and the receipt of tax revenues.
Lilly then informed the WSB of a town tax policy that is not compensated regarding the town's tax payment for
its school tax. Woodbury provides a veterans' property tax exemption that is not recognized by the State for
education tax purposes. As a result, while the exemption reduces the Town's taxable grand list, it does not
reduce the amount of state education tax that Woodbury is required to remit to the State. Under 32 V.S.A. §
5404a(d), municipalities that offer this exemption are expected to establish a separate tax rate to recover the
state education tax associated with the exempted value. Woodbury has not historically done this. As a result,
the Town has effectively absorbed this cost rather than collecting it through taxation. The impact on taxpayers
is expected to be minimal. In simple terms, the Town must raise the amount of state education tax attributable
to the veterans' exemption and spread that cost across the entire tax base. This is a topic that should be part
of our tax-rate discussions for the new fiscal year.
Lilly then shared that she has learned that temporary employees working more than 20 weeks in a year are
considered eligible for sick time. Both temporary employees have crossed this threshold. Lilly will begin
tracking their sick time. Temporary employees are not eligible for VMERS.
Updates on Buyouts with John Gordon
John states that there is not much new to report. The site inspection for asbestos at the two buyout sites will
occur the following day. If asbestos abatement is needed, the work may need to go out to bid according to the
town's purchasing policy. The led to a discussion of the Purchasing Policy and whether it should be updated.
The policy is more than ten years old. It is also stated that the policy is not law and has been overridden in
some instances in the past, always with good reason. Compliance with a local policy is required by FEMA and
other funders.

Emergency Generator The emergency generator failed to kick in during a brief power outage
over the last weekend, causing concerns from the school. When they arrived on Monday and realized there
had been an outage, Michael was called by the school and he discussed this with the maintenance person at
the school. Michael provided the MOU for the generator to the school and Diana. Under the MOU, the town is
responsible for the emergency generator and it's fuel (LPG). Discussion followed on how to remedy the
situation. Chris will call Brookfield Services to discuss an automatic weekly firing of the generator and Diana
will contact Joe Houston, head of OSSU building maintenance, to also discuss. John will check with Paul
Cerutti to ask if the WVFD is still checking the fluid levels during their monthly truck check.
FEMA Status Update There is no change in the town's status with FEMA. Lily and Skip are
double-checking to make sure the figures are correct.
Appointments The WSB appointed the following town residents to the Woodbury Fund Board -Robin
Durkee, Alex Peltz, George Sawyer, Gary Smith and Natalya Zahn.
Updates and Other Business
Bills and Payroll: Bills and payroll orders were signed at the end of the meeting.
Swenson/Polycor Quarry Act 250 Hearing Request: The hearing Is scheduled for June 26. The
SB has worked with John Reid and the town's attorney to prepare Pre_Hearing Testimony that was submitted
by the June 3 deadline.
Adjournment The meeting was adjourned at 7:42 P.M .
Signatures an ,PQJ~v~J_/
Chris Casey ---=~,.-;------~/" __ C_-_-_· "r....,-,_,,._· _
. //).. ,. ( ~--?
Diana Peduzzi (tJ ~L-v~{~--='
/_ /..., ,.., J n r-,_ D
Date Approved ~
I'
Guide to Acronyms
ACO -Animal Control Officer; ANR -Agency of Natural Resources; AOT -Agency of Transportation; AP -Accounts Payable; BR­
Better Roads; BRIC -Building Resilient Infrastructure and Communities; CDT -Collector of Delinquent Taxes; CIP -Capital
Improvement Plan; CR -Cash Receipts; CRC -Consolidated Resource Center; CVRPC -Central Vermont Regional Planning
Commission; DHC -Department of Health; EC -Ethics Commission; EMD -Emergency Management Director; EMS -Emergency
Medical Service; EOA -Elected Officials Agreement; ERAF -Emergency Relief Assistance Funds; ET -Electronic Transfer; EWPP -
Emergency Watershed Protection Program; FIRM -Federal Insurance Rate Map; FPF -Front Porch Forum; FY -Fiscal Year; GF -
General Fund; GIA-Grants in Aid; HED -Hardwick Electric Department; HERF -Highway Equipment Replacement Fund; HF -
Highway Fund; HMP -Hazard Mitigation Plan; HPD -Hardwick Police Department; H&H -Hydrological & Hydraulic; LEMP -Local
Emergency Management Plan; LHMP -Local Hazard Mitigation Plan; MMA -Money Market Account; MRGP -Municipal Roads
General Permit; MOU -Memorandum of Understanding; MTSC -Mountain Tamers Snowmobile Club; MVUESD -Mountain View
Union Elementary School District; NEMRC -New England Municipal Resource Center; NEWT -Northeast Wilderness Trust; NRCS -
Natural Resources Conservation Service; OSSU -Orleans Southwest Supervisory Union; PDM -Program Delivery Manager; POC -
Point of Contact; PR -Payroll; PTO -Paid Time Off; RBT -RB Technologies; RC -Road Commissioner; REI -Road Erosion
Inventory; RFP -Request for Proposal; ROW -Right of Way; SS -Seacoast Securities; TAC -Transportation Advisory Committee;
TAN -Tax Anticipation Note; TC -Town Clerk; TH -Town Highway; THO -Town Health Officer; TM -Town Moderator; TTr -Town
Treasurer; USDA -United States Department of Agriculture; VEM -Vermont Emergency Management; VTRANS -Vermont Agency of
Transportation; VAST -Vermont Association of Snow Travelers; WC -Workman's Compensation; WCC -Woodbury Conservation
Commission; WCL -Woodbury Community Library; W/CFS -Woodbury/Calais Food Shelf; WCSD -Washington County Sheriffs
Department; WHRT -Woodbury-Hardwick Rail Trail; WRSC -Worcester Rangers Snowmobile Club; WSB -Woodbury Select Board;
WPC -Woodbury Planning Commission; WNRCD -Winooski Natural Resources Conservation District; WVFD -Woodbury Volunteer
Fire Department; ZA -Zoning Administrator; ZBA -Zoning Board of Adjustment

June 26 Environmental Commission Swenson Hearing Postponed

MEMORANDUM
Parties’ Request for Stay of Hearing
State of Vermont Land Use Review Board
District 5 Environmental Commission
10 Baldwin Street Montpelier, VT 05633-3201
https://act250 .vermont.gov/


DATE: June 22, 2026
TO: Applicant and Statutory Parties
FROM: Susan Baird, District Coordinator
District 5 Environmental Commission
RE: Application 5W0838- 6, Swenson Granite Company, LLC, Woodbury
Parties’ Joint Request for Temporary Stay of Hearing
https://anrweb.vt.gov/ANR/Act250/Details.aspx?Num=5W0838- 6
The District 5 Environmental Commission circulated a notice and draft proposed Land Use
Permit for the above- referenced application on February 20, 2026. The notice set March 17,
2026, as the deadline to file any comments.
On March 17, 2026, the T own of Woodbury filed a timely hearing request raising issues under
Criteria 5 and 7 regarding the Parties’ failure to establish an appropriate fee to be paid by the
Applicant to cover the impacts to town roadways from the proposed expansion of its quarry
operations.
On May 14, 2026, the Commission issued a hearing notice, setting June 2 6, 2026, as the date
for the hearing in the Woodbury Town Hall. The notice required the submittal of pre-filed
testimony from both Parties. The Town filed the required submittals on June 3, 2026. The
Applicant’s filing date was June 18, 2026.
On June 17, 2026, the Parties filed a joint Stipulated Motion to Stay the Proceedings for 60
days, during which time the Parties will engage in good- faith negotiation respecting a mutually
acceptable fee agreement. By the close of the 60-day stay period, the parties will update the
District Commission and either (i) file a stipulation with the District Commission resolving the fee issue, (ii) seek additional time for further discussions; or (iii) request the setting of a new
deadline for Swenson’s prefiled testimony and a new hearing date.
The Commission hereby grants the Motion, consistent with the provisions of 10 V.S.A, 6085(e)
which promotes the expeditious, informal, and non -adversarial resolution of issues, require the
timely exchange of information concerning the application, and encourage participants to settle
differences.
Accordingly, the public hearing scheduled for June 26, 2026, is hereby stayed for 60 days. The
parties shall update the Commission regarding the status of the negotiations on or before
August 21, 2026.

Zoning Board of Adjustment – Swenson NCUA Conditional Approval

TOWN OF WOODBURY
1672 VT RT 14
P.O. BOX 10
WOODBURY, VERMONT 05681

Town Clerk: clerk@woodburyvt.org
Treasurer: treasurer@woodburyvt.org
Phone: 802-456-7051
FAX: 802-456-8834
Web Site www.woodburyvt.org

WOODBURY ZONING BOARD OF ADJUSTMENT
Date: June 17, 2026
Re: Swenson Granite Company, LLC, Michael Sylvester
Application: September 9, 2025 – Amendment to Non-Conforming Use Approval
Summary:
On September 9, 2025, an application was submitted by the above landowners, requesting
amendments to the previously existing approval for Non-Conforming Use. On September 11,
2025, the application was referred by the Zoning Administrator, Robert Martin, to the Zoning
Board of Adjustment for review as a change to the Non-Conforming Use Permit.
On October 27, 2025 a Notice of Hearing was issued, setting a hearing date of November 18,
2025. The hearing was held in recess to allow for additional fact finding.
On January 23, 2026 a Notice of Hearing was issued, setting a continuation of the recessed
hearing for February 12, 2026. The hearing was held in recess to allow for responses from the
applicant posed by the ZBA.
On June 15, 2026 a Notice of Hearing was issued, setting a continuation of the recessed hearing
for June 17, 2026.
Finding of Fact:
Due to the complexity of the application, the findings are impractical to list completely here. The
conclusions reached by the board were based on information gathered from the following
sources:
1. Application materials (on file at Woodbury Town Offices)
2. Two letters from Swenson Representative, Civil Engineer, Colen Johnson, Bowman (on file
at Woodbury Town Offices)
3. Information gathered at the two hearings. Recordings found here:
a. 11/8/25: https://www.youtube.com/watch?v=yqs1UdrIKiI
b. 2/12/26: https://hctv.us/woodbury-public-hearing-february-12-2026/

While there were several significant issues raised in the hearings the ones that came up the most
were:
1. Effects of increased traffic, including; road wear and tear, dust, safety for other non-
quarry vehicles and for the school.
2. Environmental effects, including; loss of natural beauty, pollution, excessive noise
3. Unforeseen, long-term impacts on the town associated with approving a permit change
for 60+ years.
The Board reviewed the application with the general standards of the Zoning Ordinance, Section
2.11 “Non-Conforming Uses…”. Regarding the proposed use, the Board must find that “…no
greater detrimental effect on the community will result.”
Conclusions:
Woodbury Zoning Board of Adjustment (ZBA) met on June 17, 2026 at 5:30pm. The board voted
unanimously to approve, with the following conditions, Swenson Granite Company’s application
dated September 9, 2025 to amend the previously approved non-conforming use granted to
Swenson Granite Company, LLC. the operator of the granite quarry, located at 1127 Cabot Rd,
Woodbury, VT.
The ZBA would like to note that the conditions below are informed by input from both the
community and representatives from Swenson. The one condition that stands out as diverging
from previous discussions is Condition #6. Swenson’s has stated that 40 trucks per day will be
required to make the crushing operation viable. The ZBA is approving a lower number based on
testimony from Swenson that it is not currently operating at capacity. This will allow time for the
community to get used to the larger truck volume and for Swenson to demonstrate the ability to
operate the increased volume without need for additional conditions regarding traffic impacts. If
business conditions become such that increased trucking capacity is needed, Swenson can apply
to the ZBA for an amendment to these conditions. The ZBA is committed to supporting Swenson’s
ability to successfully run a business while positively cohabitating with the Woodbury community.
Non-Conforming Use Amendment Approval Conditions:
1. Maintain the current regulatory and traffic restriction for trucks traveling to and from the
quarry. Including no trucks leaving between 7:15am-8:00am and 2:45pm-3:30pm during
the school year.
2. All dump trucks shall be covered prior to leaving the site.
3. No more than two loaded trucks shall exit the site simultaneously (within 5 minutes)
to avoid convoying.
4. Year-round, all haul dump trucks (gravel trucks) shall only enter and exit the property via
the original Swenson Quarry Road entrance which is closer to town. Not the new
entrance, which is farther from town.
5. During winter months, all haul trucks (including flatbed trucks) shall only enter and
exit the site via the original Swenson Quarry Road entrance which is closer to town. Not
the new entrance, which is farther from town.

6. The maximum number of truckloads per day shall not exceed 32 truckloads (combined
haul trucks – gravel and block).
7. Swenson will be responsible for sound monitoring for a minimum of 5 days when the
crusher is running in its first year. Results of the monitoring must be submitted to the
Town Clerk no more than 60 days after completion of the first day of monitoring and
successively for each additional day of monitoring.
8. Sound monitoring will occur as outlined above any time a different type or model of
crusher is used.
9. The expansion and proposed crushing will not impact environmental natural resources,
and Swenson will implement the stormwater improvements as shown in the application
materials.
10. Swenson remains committed to ensuring that no disruptions to the Town emergency
communications services occur. As such, Swenson will work with the Town to relocate the
services to another portion of the property prior to the tower being removed in the
future.
11. Swenson will follow the Phase timing outlined below. If adjustments need to be made due
to site or business conditions, Swenson will apply to the ZBA for an amendment to the
permit conditions. The phases below correspond to the Phase called out in the application
documentation submitted to the ZBA.
a. Approximate Lifespan at Full Production
i. Phase 1 ~ 2-8 years (Ending 2028 – 2034)
ii. Phase 2 ~ 6-14 years
iii. Phase 3 ~ 9-19 years
iv. Phase 4 ~ 5-11 years

The approval of the application is based on the plan outlined by Swenson in their application and
hearing response materials. These materials will be kept at the Woodbury Town Offices for future
reference. If there is a conflict between something in the application materials and the conditions
in this decision, the decision takes precedence.
Any failure to comply with the conditions set forth in this decision, will result in the termination
of approval of the entire Non-Compliance Amendment.
This Amendment is approved for a term of 8 years. After which time Swenson will need to return
to the Woodbury Zoning Board of Adjustment for ongoing approval.


Woodbury Board of Adjustment
By: __________________________ Jonah Meacham, Chair Date_________________
In concurrence: Skip Marchesani, Rick Cannon and Becky Browning