Select Board – Nov 9 – DRAFT MINUTES

Town of Woodbury Select Board Meeting Minutes
November 9, 2026
Attendees
Select Board Members: Diana Peduzzi, Chris Casey
Town Officials: Graham Christie (Town Clerk); Lilly Baron (Town Treasurer)
Town Employees: Peter Dailey (Road Commissioner); Michael Gray (TH Admin. Asst ., WSB assistant)
Members of the Public: Robin Durkee
Media: Jerome Lipani – HCTV
Call to Order Chris called the meeting to order at 6:02 p.m.
Adjustments to Agenda USDA/NRCS EWP update placed in the road report . There will be no buyout
update as John was unable to attend this meeting.
Approval of Meeting Minutes The minutes for the 10/2 6/2026

WSB meeting were approved.
Public Comment Michael states that at the recent WCC meeting, members were unaware of the
reasons for the increase in town taxes and suggests the WSB again try to get the word out for the increase .
Road Report with Peter Dailey
The road crew has the town trucks ready for the arrival of winter.
The concrete slab under the salt shed is deteriorating and is being removed, to prepare for pouring of a new slab.
Peter also announced the road crew will stay on its 4 day week,10 hour days schedule, instead of the previous four
and a half day winter schedule. The day will start at 5:30, giving them extra time to stay ahead of the school busses
The day will end at 3:30.
Peter would like to revisit the alternate re-routing of the sharp corner on Valley Lake Road that was under study a
few years ago. The corner is dangerous for traffic, has always been impossible to maintain and is a source of
erosion into a nearby stream. Discussion of this possibility follows. The WSB is open to the idea and the landowner
is still open to the land swap that was proposed to allow the change. Diana feels strongly that an engineer should
be involved to design any re-alignment. Peter believes that it should be a project by an outside contractor. There
has never been a budget estimated or approved for the project.
Michael shares that the USDA/NRCS EWP project for Buck Lake Brook/Cabot Road is now in the process of
developing an RFP for a design contract. Lincoln Frasca of CVRPC has been asked and accepted the role of putting
together the draft RFP. Once the draft is finished, sometime in December, it will be reviewed by the WSB and
USDA/NRCS before the final draft RFP is p ut out for bid. A list of potential civil engineers with sufficient experience
to best understand the complex situation is being developed to receive the RFP.
Coe & Coe Architects Town Gara ge Study Proposal with James Coe
James Coe has visited the Town Garage and developed a phased plan for the WSB to use in deciding what steps to
take for needed improvements to the Town Garage. He listed several small-town town garages his firm has
designed. They are also the designers for the addition to the new Woodbury fire station. The proposal is for a pre-
design study of the town garage with a cost of $10,000 for the study. The pre-design study would serve as a
stepping stone to provide information for discussion and planning for possibilities concerning the town garage.
James proposes three deliverables included in the study …
1) Total cost for the fix of the present problem with the r oof and ceiling for the insurance claim.
2) Possibilities for the upgrade of the existing shell of the garage.

3) The elimination of the present garage to create a new building on the current site.
Lilly reported on the status of the PACIF/VLCT insurance payment for the ceiling/roof ; which is still on hold . She
stated that the town could accept the payment and would still be able to request more if the proposed study
determines repair of damages would cost more. Options on how to proceed are discussed. It is decided that the
town will accept the amount offered by PACIF-$40,000 and ask for a statement in writing from PACIF that there
could be more paid to the town if it is determined that their estimate was inadequate. Peter was asked what the
status of the roof/ceiling is at the moment. He said that nothing has been done yet and that the ceiling still has
several holes. He plans on covering the ceiling holes with foam board insulation to help keep the heat in the garage
this winter. Diana moved to approve the study proposed by Coe & Coe. Chris noted that John Gordon had
recently emailed that he approved the proposal . The contract was approved.
Town Clerk’s Report with Graham Christie
Graham presented the yearly service contract for the elevator at the town office. The fee is $425. Robin confirm ed
this is the same amount as last year’s contract. WSB approved the contract. The special town meeting minutes
have been completed by Stephen Mur phy, the town moderator. The WSB will review the minutes and approve at
their next meeting. Graham has two forms, an Act 154 Good Standing Certification and a Municipal Resolution
Form from the Department of Housing and Community Development (DHCD) that need to be signed by the WSB.
These forms are in regard to the municipal planning grant th at Graham, as the town’s zoning administrator, is
hoping the planning commission will submit to DHCD. The WSB requests time to review the forms. Graham closes
his report by saying he survived his first general election and thanks Robin and the many volunteers that assisted
on election day.
Town Treasurer’s Report with Lilly Baron
Total cash on hand at the end of October was $2,769,594 with $700,00 more collected since the end of October. In
November, these funds will be dispersed to the Library, Cemetery, Highway Fund and HERF. The education funds
will also be disbursed in November. Grant expenditures in are currently showing a negative balance as the town
waits for reimbursements for projects that have been completed. General fund expenditures generally run higher
during the first half of the fiscal year, largely due to the to the annual appropriations and payments to non -profits
as well as town designated funds, like the library, cemetery and the WVFD. The Highway Fund is showing a year -to-
date deficit of $128,928. Overall, the town’s operating funds collectively show a positive year-to-date variance
of $2,632,865. It is anticipated that the budgeted line item for diesel fuel will exceed what was budgeted for FY 27.
The town’s health insurance is up for renewal, with the monthly individual premium increasing from $1,216 to
$1,283. This represents an annual increase of about $680 per employee for the town’s share and $800 in total
premium costs for each employee.
There is a new draft MOU from Hardwick for West Woodbury winter road maintenance with proposed costs of
$9,500 (FY27), $12,00 0 (FY28) and $12,600 (FY29). The WSB consents to moving forward with this draft MOU.
Lilly suggests that the WSB start looking ahead for anticipated projects and costs that would allow for an element
of financial planning that would aidt he yearly budget proposal process. She’ll also be looking at the current
budget to determine changes that might be incorporated. All this in hopes of developing a budget that addresses
current needs while also preparing for future projects and expenses.

Swenson Act 250 Permit Diana reported the quarry’s Act 250 permit has been approved and that
the increase in reimbursement to the town is a part of the permit. The District Commission has approved the
project application that was submitted a year ago. The project involves expansions to the quarry footprint, over a
number of years, and addition of a crushing operation to ease the problem of storage of waste granite (grout). The
complete permit can be seen here: woodburyvt.org/2026/11/20/swenson-granite-co-act-250-permit-agreement-
with-town

Planning Commission Applicants
The WSB has received three applications for appointment to the Planning Commission. Lilly Baron, Michael
Boisvert and Jerome (Jerry) Hatch were appointed to four-year terms. Beth McCollough had recently been
appointed at a previous WSB meeting. Michael will contact Jim Schweithelm and Andrew Delaney, current PC
members, to get a meeting in place ASAP. There needs to be a Planning Commission chair to sign the application
for a municipal planning grant that Graham is hoping will aid in the coming work of updating the zoning ordinance.

Updates and Other Business
Bills and Payroll: Bills and payroll orders were signed at the end of the meeting.
Adjournment The meeting was adjourned at 7:40 p.m.
Signatures and Approval
Chris Casey ______________________ Diana Peduzzi _________________________
John Gordon ______________________ Date Approved __________

Guide to Acronyms
ACO – Animal Control Officer; ANR – Agency of Natural Resources; AOT – Agency of Transportation; AP – Accounts
Payable; BR- Better Roads; BRIC – Building Resilient Infrastructure and Communities; CDT – Collector of
Delinquent Taxes; CIP – Capital Improvement Plan; COI – Certificate of Insurance; CR – Cash Receipts; CVRPC –
Central Vermont Regional Planning Commission; DHCD – Department of Housing and Community Development;
ELPDA – East Long Pond Dam Association; EMD – Emergency Management Director; EMS – Emergency Medical
Service; ERAF – Emergency Relief Assistance Funds; ET – Electronic Transfer; EWPP – Emergency Watershed
Protection Program; FIRM – Federal Insurance Rate Map; FPF – Front Porch Forum; FY – Fiscal Year; GF – General
Fund; GIA – Grants in Aid; HED – Hardwick Electric Department; HERF – Highway Equipment Replacement Fund;
HF – Highway Fund; HMP – Hazard Mitigation Plan; H&H – Hydrological & Hydraulic; HO – Health Officer; LEMP –
Local Emergency Management Plan; K – thousand; LHMP – Local Hazard Mitigation Plan; MMA – Money Market
Account; MRGP – Municipal Roads General Permit; MOU – Memorandum of Understanding; MVUESD – Mountain
View Union Elementary School District; NEMRC – New England Municipal Resource Center; NEWT – Northeast
Wilderness Trust; NRCS – Natural Resources Conservation Service; OSSU – Orleans Southwest Supervisory
Union; PR – Payroll; PTO – Paid Time Off; RBT – RB Technologies; RC – Road Commissioner; REI – Road Erosion
Inventory; RFP – Request for Proposal; ROW – Right of Way; TAN – Tax Anticipation Note; TC – Town Clerk; TH –
Town Highway; THO – Town Health Officer; TM – Town Moderator; TTr – Town Treasurer; USDA – United States
Department of Agriculture; VDH – Vermont Department of Health; VEM – Vermont Emergency Management;
VTRANS – Vermont Agency of Transportation; WCC – Woodbury Conservation Commission; WCL – Woodbury
Community Library; W/CFS – Woodbury/Calais Food Shelf; WCSD – Washington County Sheriff’s Department;
WEC – Washington Electric Co.; WNRCD – Winooski Natural Resource Conservation District; WSB – Woodbury
Select Board; WPC – Woodbury Planning Commission; WVFD – Woodbury Volunteer Fire Department; ZA – Zoning
Administrator; ZBA – Zoning Board of Adjustment; ZO – Zoning Ordinance